Applications

PECO Powersaver suits facilities with long operating hours, mixed three-phase loads and central low-voltage distribution. It does not suit every installation, and the sections below say where.

The Common Factors

The equipment performs best where these conditions hold together.

  • Long operating hours. Savings accumulate in kWh over time. A facility running 18–24 hours a day accumulates more than one running eight.
  • Motor-driven plant, much of it inverter-driven. Compressors, pumps, fans and chillers. This is where our strongest measured results have come from.
  • Mixed load composition. Motor plant, resistive loads and lighting together, rather than a single dominant load type.
  • Measurable phase imbalance. Common in buildings where single-phase circuits have been added over the years.
  • Central low-voltage distribution. A single main supply point downstream of which one unit can serve the whole system.

Conditions under which we do not recommend the system

Primary Application

Hotels & Resorts

Why hotels in particular

A hotel is close to the ideal load profile for this equipment, and not only because it runs continuously.

Plant load is mixed and constant: chillers, air handling, pumps, refrigeration, commercial kitchens, laundry, water heating, lifts and back-of-house lighting. Chillers and large pumps in modern hotels are usually inverter-driven — the load type from which our strongest measured results have come. And guest room circuits added over successive refurbishments are a common source of phase imbalance.

Hotels also hold assets for long periods, which suits equipment with a three-year transformer warranty, no consumable parts and no software.

Where PECO Powersaver is installed in a hotel Power flows from the hotel main transformer to the main low-voltage distribution, then through one PECO Powersaver unit in the electrical room, then to the hotel distribution boards, which supply guest floors, HVAC and chillers, kitchen, laundry and pool, and lifts and lighting. Hotel Main Transformer Main LV Distribution PECO Powersaver one unit, electrical room only Hotel Distribution Boards GuestFloors HVAC &Chillers Kitchen Laundry& Pool Lifts &Lighting
Installed in the electrical room only. No guest-facing equipment is modified.

What hotel engineering teams ask

Will guests notice anything?No. Output remains within the supply voltage range permitted by EN 50160 and IEC 60038. Lighting, air conditioning and hot water operate normally.
How long is the shutdown?A planned outage of the main distribution is required. Duration depends on cable and busbar work at the site and is estimated during technical review, then scheduled with your team — typically during a low-occupancy period.
Does it connect to our BMS?It does not need to. The system operates independently of building management and metering systems. Remote status contacts are available as an option.
What about chillers with variable-speed drives?Load composition is reviewed before any proposal. Where tightly regulated constant-power loads dominate, we say so rather than proceed.
What if it does not suit us after installation?The By-pass path restores the original supply arrangement exactly, at any time.
Who maintains it?Your own team. Visual inspection, keeping ventilation clear, checking bolted joints and verifying voltages, at intervals set by your maintenance policy.
How do we show the owner it worked?Accumulated kWh at the billing meter, under an agreed comparison protocol. Reports are written to be checked by your own engineers.
How much space is needed?From 600 × 700 mm footprint at 100 kVA. Front and rear clearance is required for door access and ventilation.

Over more than ten years of hotel installations — where acoustic requirements are among the strictest of any facility type — no noise-related issue has been reported.

Experience

PECO Powersaver has been supplied to international hotel and resort groups in the United Arab Emirates, India, Thailand, Malaysia, Italy and South America.

Customer names, site locations and project results are confidential and are shared only under a non-disclosure agreement during technical review.

Strongest Measured Results

Industrial Facilities

Where the results have been strongest

Aluminium forging plant and facilities driven by large inverter-controlled motors have produced our strongest measured results. Compressors, process pumps and fans in the hundreds of kilowatts, running continuous or multi-shift operation, accumulate savings faster than any other load type we have measured.

As inverter drives become standard on large motors, this is an increasing share of industrial load — and of commercial load too.

  • Air compressors
  • Large inverter-driven motors
  • Process pumps and fans
  • Forging and metal processing
  • Ventilation and dust extraction
  • Process heating
  • Plant lighting

Why we do not explain it further here

We could offer a theory. We would rather offer a measurement.

What we know is what the meter recorded, at the sites where we recorded it. Whether the same holds at your facility is established the same way — accumulated kWh, under agreed comparison conditions, before and after installation.

How savings are measured

What plant engineers ask

Does it affect drive operation?The output stays within the voltage range permitted by EN 50160 and IEC 60038 for a nominal 400 V system. Drive input requirements are reviewed before any proposal.
Can it be installed without stopping production?No. A planned outage of the main distribution is required. Duration depends on cable and busbar work at the site and is scheduled with your team — usually during a maintenance window or shutdown.
What if it does not suit our load?The By-pass path restores the original supply arrangement exactly, at any time.
Does it need cooling or a controlled room?Indoor installation with standard switchgear room ventilation. IP 42. No air conditioning required.
What maintenance does it need?Visual inspection, keeping ventilation clear, checking bolted joints and verifying voltages. No consumable parts, no software.
How do we prove the saving to management?Accumulated kWh at the billing meter, under an agreed protocol. Where the site is rectifier-heavy, a harmonic spectrum can be recorded before and after as an optional addition.

Worth checking first

Load factor and operating pattern

Savings accumulate in kWh, so a plant running one shift with long idle periods accumulates more slowly than one running continuously. Highly intermittent operation — batch processes with long gaps, or seasonal plant — changes the assessment.

We ask for twelve months of consumption data before proposing anything.

Shopping Centres & Retail

Long trading hours, escalators and travelators running continuously, large refrigeration and HVAC plant, and lighting across common areas and tenancies. Load is high and steady through the trading day and drops sharply overnight, which makes period-matched comparison straightforward.

  • HVAC and chillers
  • Escalators and lifts
  • Refrigeration
  • Common-area lighting
  • Tenant distribution panels
  • Car park ventilation

Worth planning for

Where the saving appears

In a multi-tenant centre, the answer depends on where the unit sits. Installed on the landlord’s main distribution, the saving appears in common-area consumption. Installed upstream of tenant panels, part of the benefit appears on tenant accounts rather than the landlord’s.

This is a commercial question rather than a technical one, but it is worth settling before the installation rather than after. We raise it at the review stage.

Office & Commercial Buildings

HVAC and air handling, lifts, lighting, office electronics and building services. Single-phase electronic loads are dense, and phase imbalance is common where floors have been fitted out at different times.

  • HVAC and air handling
  • Lifts
  • Lighting
  • Office equipment and IT rooms
  • Water pumps
  • Car park ventilation

Worth checking first

Load factor after hybrid working

Office occupancy patterns have changed in many markets. A building operating at substantially reduced weekday occupancy has a lower load factor than its design assumed, and savings accumulate more slowly as a result.

This does not rule out the equipment, but it changes the assessment. We ask for twelve months of consumption data for office buildings rather than working from installed capacity.

What We Need From You

Assessment is free and comes before any proposal. To carry it out we need:

Required

  • Transformer rating (kVA)
  • Single-line diagram of the low-voltage distribution
  • Nominal voltage and frequency
  • Maximum load current

Helpful

  • Twelve months of electricity consumption data
  • General description of load composition
  • Photograph of the electrical room and available space
  • Occupancy or production volume data, if available

From this we confirm whether the equipment is suitable, what rating applies, how it would be connected, and what outage the installation would require. If it is not suitable, that is what we will tell you.

Send Your Single-Line Diagram

Technical review typically takes a few working days. We will tell you what we find, including if the answer is that PECO is not the right equipment for your facility.